2. Turbine hall area

For turbine halls, temporary sheet piling (normally ~10m in height) are deployed in order to excavate a large area. OSP is able to specifically tailor installation of piles to consider soil heaving and/or water piping through the bottom of the retaining wall.
error: Content is protected !!