Karara Iron Ore Project – Berth 7 Tubular Piles, Australia

• Constructed jetty foundation using steel pipes.

• Supplied more than 1800 metric tonnes of steel pile for the project.

• Additionally, provided coating and driving shoes.
 

error: Content is protected !!