• Constructed the new 2nd bridge between West Malaysia and Penang Island, allowing commuters less congested access between.
• Supplied more than 11,000 metric tonnes of pipe piles
• Additionally, provided coating, inner rings, driving shoes and lifting lugs in order to ensure maximum stability and durability for the entire project.