• River beautification works done using a permanent structure • More than 1500 metric tonnes of OZ sheet piles supplied • Vibrohammer driving machine used to […]
• Development of Drainage System Project with a water gate structure; located at Samutphrakarn • Excavation depth about 4m to 5m • More than 300 tonnes […]
• River beautification works done using a permanent structure • More than 700 metric tonnes of OZ sheet piles supplied • Vibrohammer driving machine used to […]